Prefabricated Modular Shipping Containers Building Mining Site Camp Accommodation Office
| Material: | High-strength Steel Structure + Sandwich Panels | Quality: | High Quality |
|---|---|---|---|
| Country Of Origin: | China | Building Size: | Customizable |
| Roof & Wall Panel: | Sandwich Panel | Windows & Doors: | Aluminum Alloy Windows With Security Screens, Steel Security Doors |
| Highlight |
Prefabricated modular shipping containers,Mining site modular shipping containers,prefabricated container office Accommodation |
||
The YAGO durable modular building is developed for mining camp projects that require both residential and administrative functions in a compact, single-floor layout. The structure uses a modular system that ensures dependable performance while simplifying logistics and on-site construction. Factory-prefabricated sections help maintain build quality and reduce installation complexity in remote locations.
The layout can be arranged for staff dormitories, office areas, and meeting spaces within one building. With insulated wall panels, ventilation systems, and basic utility, it creates a practical environment for both living and daily operations. The building size and internal layout can be customized according to project requirements.




| Item | Specification | ||
|---|---|---|---|
| Steel Frame System System | |||
| Roof structure | Main roof frame: Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| Floor structure | Main floor frame: Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| Corner pillar | Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | |||
| Roof covering | Galvanized Powder Coated color painting steel Sheet. | ||
| Insulation | Fiber glass with aluminum foil | ||
| Ceiling board | Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | |||
| PVC flooring | Vinly floor leather with glue | ||
| Floor board | 18mm fiber cement board | ||
| ContainerWall System | |||
| Wall panel | 50mm /75mm fireproof Mineral Rockwool Sandwich panel | ||
| Door | Insulated Steel Door | ||
| Window | PVC sliding window, double glass, with fly screen | ||
| Container Electrical System | |||
| Power distribution cabinet | Circuits with air-break switch, leakage protector, | ||
| Light | LED light, 24W | ||
| AC Socket | 16A universal, with socket box | ||
| Common Socket | 10A, Universal type, with socket box | ||
| Switch | 10A , with switch box | ||
| Plumbing system(Optional as per drawing) | |||
| Washbasin | including the accessory | ||
| Closetool | including the accessory | ||
| Shower | shower base, shower head, water mixture | ||
| Exhaust Fan | 6 Inch | ||
| Water pipe | input and output water pipe | ||
| Stair case and Corridor (Optional as per drawing) | |||
| Stair Case and Corridor | Fabricated with C channel steel, square tube, Round Steel, And checkered Steel Plate | ||
| Additional Traingle Roof on Top of Each Block(Optional as per drawing) | |||
| Roof Structure | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| Roof Covering | Corrugated Galvanized Powder Coated Roof Tile | ||
- Durable Modular Structure: Steel framework ensures stability and long service life.
- Fast Installation: Prefabricated modules allow efficient on-site assembly.
- Combined Function Design: Suitable for both accommodation and office use.
- Flexible Layout: Interior can be arranged as dormitories, offices, or meeting rooms.
- Suitable for Remote Sites: Designed for mining and construction environments.
- Customizable Configuration: Building size and layout can be adjusted to project needs.
- Mining Camp Facilities: Used for accommodation and office functions on site.
- Construction Project Sites: Suitable for living and administrative spaces.
- Remote Industrial Operations: Provides practical buildings where fast deployment is required.
- Project Contractors and Engineering Teams: Supports daily site management and workforce accommodation.
- Camp Service Providers: Suitable for operators managing accommodation and office facilities.
- Q1: Is the modular building suitable for remote project sites?
A: Yes, it is designed for easy transport and efficient installation in remote locations. - Q2: Is the building suitable for repeated use or relocation?
A: Yes, modular components allow the building to be dismantled and reused at other project sites. - Q3: Can the building layout be customized?
A: Yes, the size and internal configuration can be adjusted according to requirements. - Q4: Does the modular design reduce construction time?
A: Yes, prefabrication significantly shortens on-site construction duration.