Prefabricated Steel Structure Modular Container House for Mining Camp
| Length,width And Height: | M2 | ||
|---|---|---|---|
| Highlight |
prefabricated site office flat pack,modular prefabricated building,modular site office flat pack |
||
This high-performance Prefabricated Steel Structure Modular Container House is a rapid-deployment solution designed for global mining, energy, and large-scale infrastructure projects. It combines the cost-efficiency of China Prefabricated Building with industrial-grade Fabricated Steel Structure strength. Whether utilized for Mining Camp Accommodation or temporary command centers, this system provides a secure, comfortable, and long-lasting living environment in extreme conditions, making it the premier choice for Accommodation Camp development.
| Fpatpack container SPECIFICATION SHEET | ||||
| Project name: Flatpack Container 6.06*2.435*2.89m | ||||
| A | Item | Specification | ||
| Steel Frame System System | ||||
| 1 | Roof structure | Main roof frame: Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | Main floor frame: Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||
| 1 | Roof covering | Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | Fiber glass with aluminum foil | ||
| 3 | Ceiling board | Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||
| 1 | PVC flooring | Vinly floor leather with glue | ||
| 2 | Floor board | 18mm fiber cement board | ||
| ContainerWall System | ||||
| 1 | Wall panel | 50mm /75mm fireproof Mineral Rockwool Sandwich panel | ||
| 2 | Door | Insulated Steel Door | ||
| 3 | Window | PVC sliding window, double glass, with fly screen | ||
| Container Electrical System | ||||
| 1 | Power distribution cabinet | Circuits with air-break switch, leakage protector, | ||
| 2 | Light | LED light, 24W | ||
| 3 | AC Socket | 16A universal, with socket box | ||
| 4 | Common Socket | 10A, Universal type, with socket box | ||
| 5 | Switch | 10A , with switch box | ||
| Plumbing system(Optional as per drawing) | ||||
| 1 | washbasin | including the accessory | ||
| 2 | Closetool | including the accessory | ||
| 3 | shower | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | 6 Inch | ||
| 5 | water pipe | input and output water pipe | ||
| Stair case and Corridor. (Optional as per drawing) | ||||
| 1 | Stair Case and Corridor | Fabricated with C channel steel, square tube, Round Steel, And checkered Steel Plate | ||
| Additional Traingle Roof on Top of Each Block. (Optional as per drawing) | ||||
| 1 | Roof Structure | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | Corrugated Galvanized Powder Coated Roof Tile | ||



- Mining & Energy Camps: Providing safe, weather-proof Mining Camp Accommodation for exploration teams and laborers in remote regions.
- Site Command Centers: Modular offices for engineers and managers, complete with HVAC, network cabling, and conference spaces.
- Industrial Storage: Using the robust Fabricated Steel Structure to build temporary Warehouse Steel Structure facilities to protect high-value mining equipment.
- Community Facilities: Rapidly establishing on-site clinics, full-service canteens, laundry units, and recreation centers.
Q1: Will your steel structure rust in humid, coastal mining environments?
A: No. Our Fabricated Steel Structure is hot-dip galvanized and finished with three layers of high-performance anti-corrosive coating. Designed specifically for high-salinity and high-humidity environments.
Q2: What is the fire rating of these modular container houses?
A: Safety is paramount in mining. Our Container Modular House walls use non-combustible Rockwool sandwich panels, meeting Class A Fire Standards. This effectively prevents fire spread, protecting both personnel and assets.
Q3: Is it expensive to transport these units to remote African mining sites?
A: We use a Flat-pack model, which reduces shipping volume by 75% compared to pre-assembled units. This significantly lowers ocean freight costs and makes overland transport via truck much more efficient for inland projects.
Q4: Can we customize the layout according to EPCM technical drawings?
A: Absolutely. As a veteran China Prefabricated Building supplier, we regularly work with global engineering firms. We can adjust steel thickness and insulation density and customize electrical outlets/switches to match your specific project Data Sheets.
Q5: Does the assembly require a professional heavy crane?
A: Not necessarily. Due to the modular design, a forklift or small hoist is usually sufficient. We provide 3D installation manuals and instructional videos to support Rapid Deployment. For large-scale projects, we can also dispatch supervisors to the site.