Temporary Prefabricated Modular Buildings Container Accommodation Camp housing
| Highlight |
prefabricated modular buildings Container,prefabricated modular buildings Camp,temporary modular housing Camp |
||
|---|---|---|---|
| Fpatpack container SPECIFICATION SHEET | ||||
| Project name: Flatpack Container 6.06*2.435*2.89m | ||||
| A | Item | Specification | ||
| Steel Frame System System | ||||
| 1 | Roof structure | Main roof frame: Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | Main floor frame: Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||
| 1 | Roof covering | Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | Fiber glass with aluminum foil | ||
| 3 | Ceiling board | Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||
| 1 | PVC flooring | Vinly floor leather with glue | ||
| 2 | Floor board | 18mm fiber cement board | ||
| ContainerWall System | ||||
| 1 | Wall panel | 50mm /75mm fireproof Mineral Rockwool Sandwich panel | ||
| 2 | Door | Insulated Steel Door | ||
| 3 | Window | PVC sliding window, double glass, with fly screen | ||
| Container Electrical System | ||||
| 1 | Power distribution cabinet | Circuits with air-break switch, leakage protector, | ||
| 2 | Light | LED light, 24W | ||
| 3 | AC Socket | 16A universal, with socket box | ||
| 4 | Common Socket | 10A, Universal type, with socket box | ||
| 5 | Switch | 10A , with switch box | ||
| Plumbing system(Optional as per drawing) | ||||
| 1 | washbasin | including the accessory | ||
| 2 | Closetool | including the accessory | ||
| 3 | shower | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | 6 Inch | ||
| 5 | water pipe | input and output water pipe | ||
| Stair case and Corridor. (Optional as per drawing) | ||||
| 1 | Stair Case and Corridor | Fabricated with C channel steel, square tube, Round Steel, And checkered Steel Plate | ||
| Additional Traingle Roof on Top of Each Block. (Optional as per drawing) | ||||
| 1 | Roof Structure | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | Corrugated Galvanized Powder Coated Roof Tile | ||



Mining & Energy Exploration: Providing secure, wind-resistant mobile camps for exploration teams and miners in remote wilderness areas.
Infrastructure Projects: Establishing temporary administrative offices and staff dormitories for highway, railway, and bridge construction sites.
Emergency & Disaster Relief: Deploying as transitional housing, mobile hospitals, or command centers following natural disasters.
Tourism & Commercial Use: Converting units into eco-friendly hotels, container cafes, or modular glamping pods for scenic resorts.
A: To maximize logistics efficiency, our "Flat-pack" design allows 6 standard units to be loaded into one 40ft HQ container. This reduces overseas shipping costs by approximately 75% compared to shipping pre-assembled units, making it highly economical for international projects.
A: Absolutely. Our modular system is highly flexible. We can design internal partitions to create executive suites, communal dormitories, laundry rooms, or commercial kitchens. You can choose from various flooring grades, wall finishes, and integrated furniture packages to suit your project's specific grade.
A: For a standard unit, a team of 3 skilled workers assisted by a crane can complete assembly, sealing, and power connection within 2 to 4 hours.
A: Yes. We use modular components that are easy to replace. The exterior panels are finished with a high-durability coating that resists UV damage and scratching. If a panel is damaged, it can be swapped out individually without dismantling the entire structure, making it ideal for remote maintenance.
A: While material costs vary, the primary saving is in time and labor. Our prefab camps reduce construction schedules by 50% to 70%. Additionally, because they are classified as temporary structures in many regions, they often incur lower taxes and permit fees, and can be sold or relocated as assets once the project ends.