logo

Multi Story Temporary Modular Housing Prefabricated Office Structures

Basic Properties
Place of Origin: China
Brand Name: YAGO Industry
Certification: ISO;CE
Model Number: YGCJ23
Trading Properties
Minimum Order Quantity: 6units
Payment Terms: L/C,T/T
Supply Ability: 1500-2000units/month
Roof Structure: Q235 Galvanized Steel Profile, With Automatic Powder Coated Paint Floor Structure: Q235 Galvanized Steel Profile, With Automatic Powder Coated Paint
Corner Pillar: Q235 Galvanized Steel Profile, Galvanized With Automatic Powder Coated Paint Roof Covering: Galvanized Powder Coated Color Painting Steel Sheet
Insulation: Fiber Glass With Aluminum Foil Ceiling Board: Galvanized Powder Coated Color Painting Steel Sheet
Highlight

multi story temporary modular housing

,

prefabricated temporary modular housing

,

multi story prefabricated office structures

Product Description
Warehouse Steel Structure Frames for Flexible Storage, Modular Expansion, and Prefabricated Industrial Facilities
Product Introduction

This YAGO multi‑story combined modular camp building is a large‑scale integrated temporary camp solution composed of multiple stacked and connected container units. It provides centralized accommodation, office, dining and sanitary space for large construction camps, mining bases, oilfield stations and overseas engineering bases.

Product Description

This multi‑story combined modular camp adopts standardized container units, which can be stacked up to 3 floors and connected horizontally to form a large‑scale camp complex. Each unit is factory‑prefabricated, with fast on‑site assembly. The structure is stable and wind‑resistant, with excellent thermal insulation. The camp can include dormitory, office, canteen, bathroom, meeting room and other functional areas. It has complete water, electricity and sewage system, safe and comfortable, suitable for large‑scale staff centralized living.

Application Scenarios
  • Large‑scale construction staff camp
  • Mining & oilfield base living quarter
  • Overseas engineering project large camp
  • Long‑term field staff centralized accommodation
  • Emergency rescue & resettlement center
Specifications
Fpatpack container  SPECIFICATION SHEET
Project name:  Flatpack Container    6.06*2.435*2.89m
A Item Specification
Steel Frame System System
Roof structure Main roof frame:  Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel
Floor structure Main floor frame: Q235  galvanized  Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel
Corner pillar  Q235  galvanized  Steel profile, Galvanized with Automatic Powder Coated paint
Container roof System
Roof covering  Galvanized Powder Coated color painting steel Sheet.
Insulation  Fiber glass with aluminum foil 
Ceiling board  Galvanized Powder Coated color painting steel Sheet.
Container floor System
PVC flooring  Vinly floor leather with glue
Floor board 18mm  fiber cement board
ContainerWall System
Wall panel 50mm /75mm  fireproof Mineral Rockwool Sandwich panel
Door Insulated Steel Door 
Window PVC sliding window, double glass, with fly screen  
Container Electrical System 
Power distribution cabinet Circuits with air-break switch, leakage protector,  
Light LED light, 24W
AC Socket 16A universal, with socket box
Common Socket 10A, Universal type, with socket box
Switch 10A , with switch box
Plumbing system(Optional as per drawing)
washbasin including the accessory
Closetool including the accessory
shower shower base, shower head, water mixture
Exhaust Fan  6 Inch
water pipe input and output water pipe
Stair case and Corridor. (Optional as per drawing)
Stair Case and Corridor Fabricated with C channel steel, square tube, Round Steel, And checkered Steel Plate
Additional Traingle Roof on Top of  Each Block. (Optional as per drawing)
Roof Structure Fabricated with C section steel, Galvanized Q235 Steel.
Roof Covering Corrugated Galvanized Powder Coated Roof Tile
Advantages
  • Large capacity for hundreds of people
  • Fast construction of integrated camp
  • Stable structure, stackable up to 3 floors
  • Full functions: living, office, dining, washing
  • Reusable & relocatable
FAQ
Q: How many people can one camp accommodate?

A: Customizable from 50 to 2000 people.

Q: How long to build a 500‑person camp?

A: Normally 30–45 days.

Q: Is it safe to stack 3 floors?

A: Yes, designed strictly per steel structure standard.

Q: Can we add canteen and bathroom?

A: Yes, one‑stop full functional camp solution.

Q: Can it be moved to a new site?

A: Yes, detachable and reusable for many times.

Leave a Message
Please fill in the details below.
We'd love to hear from you!