220V Insulated Prefab Modular Office Rockwool Panel Temporary Housing
| Steel Frame: | Square Tube Columns, Q235 Steel, Galvanized Steel With Powder Coated Painting | Roof Panel: | 50mm/75mm/100mm Rockwool Sandwich Panel |
|---|---|---|---|
| Wall Panel: | 50mm/75mm/100mm Rockwool Sandwich Panel | Door Size: | 850mm*2030mm |
| Window Type: | PVC Sliding Window With Double Glas, With Screen And Window Blind | Electrical Voltage: | 220V,60HZ |
| Highlight |
220V prefab modular office,Insulated prefab modular office,Rockwool Panel prefab temporary housing |
||
This Senior Management Prefab Building is a high‑end integrated modular building designed for executive offices, management accommodation and VIP reception. It combines elegant layout, superior fireproof performance, comfortable interior and complete facilities, providing a quiet, safe and high‑grade working & living space for project management teams, field leadership quarters and high‑end temporary offices.
This senior management building adopts Q235 galvanized square tube columns with powder coating for stable and upscale structure. Roof and wall use galvanized Q235 C‑section steel as purlins, matched with L40*3 cross bracing and M16 chemical anchor bolts for firm fixation. The whole building uses 50/75/100mm rockwool sandwich panels for roof and walls, reaching high fireproof grade. Dry areas are equipped with gypsum board ceiling and vinyl floor leather; wet areas adopt calcium silicate board ceiling and ceramic tiles for waterproof and durable use. Configured with insulated steel door and PVC double‑glazed sliding windows with screen and blind. Pre‑installed electrical system includes LED lights, 10A/16A sockets, switches and power distribution cabinet with leakage protection. Complete plumbing system has toilet, washbasin, shower and water pipes, ready for use upon installation.
- Project senior management office & accommodation
- VIP reception center & leadership lounge
- High‑end field command center
- Executive temporary quarters & meeting room
- Overseas project management headquarters
| Project name: Senior and Junior Management building | |
| Item | Specification |
|---|---|
| Main Steel Frame | |
| Steel frame | Square Tube Columns, Q235 Steel, Galvanized Steel with Powder coated painting |
| Steel structure roof | C Section Steel, Q235 Steel, galvanized |
| Roof Purlin | C Section Steel, Q235 Steel, galvanized |
| Wall purlin | C Section Steel, Q235 Steel, galvanized |
| Cross bracing | L40*3 |
| Anchor bolts | M16, chemical Bolts |
| Ordinary bolt | 4.8S,Zincification, |
| Roofing and wall System | |
| Roof Panel | 50mm/75mm/100mm Rockwool Sandwich panel |
| Wall Panel | 50mm/75mm/100mm Rockwool Sandwich panel |
| Ceiling & Flooring | |
| Dry room Ceiling | Gypsum board,with frame |
| Dry room Floor leather | Vinyl floor leather |
| Wet room Ceiling02 | Calcium silicate board Ceiling with Ceiling keel |
| Wet Ceramic tile | Ceramic Tiles |
| Doors&windows | |
| Door | Insulated Steel door, 850mm*2030mm |
| Window | PVC sliding window with double glas, with screen and window blind |
| Electric unit and sanitary facilities&plumbing | |
| Electric cable | With electrical cable for lighting, socket, AC and water heater system. |
| Lights | LED light 220V,60HZ |
| Switch | with junction box |
| Socket | 10A and 16A , with junction box |
| Power distribution cabinet | box+switch+earth leakage protective device |
| Toilet | including water valve |
| Washbasin | including faucet, water pipe |
| Shower | With shower head, water mixture, and shower base |
| Water pipe | input and output water pipe |
- High‑end management‑level design, elegant & comfortable
- A‑level fireproof rockwool panel, safe & reliable
- Dry & wet separation, reasonable layout
- Complete electrical & plumbing, ready to use
- Good sound & thermal insulation, quiet environment
- Beautiful appearance, suitable for long‑term use
Q: What fireproof grade does this building reach?
A: Rockwool panel ensures A‑level fireproof performance.
Q: Can we customize interior layout?
A: Yes, support office, bedroom, reception room combination.
Q: Is the window with blind?
A: Yes, built‑in window blind for light adjustment.
Q: Can it be used as permanent office?
A: Yes, durable structure suitable for long‑term use.
Q: How long is installation period?
A: 2–3 workers can finish installation within one day.


