Custom Modular Office Building Prefabricated Workspace with Galvanized Steel Frame and Sandwich Panel for Construction and Mining Site Teams
| Primary Frame: | Welded H-section Steel / Hot-rolled Steel (ASTM A36 Or S235JR Equivalent) | Surface Treatment: | Hot-dip Galvanized (Min. 600g/m²) Or Premium Anti-corrosion Painting |
|---|---|---|---|
| Roof & Wall Panels: | Sandwich Panels (Rock Wool/PU/EPS) Or Single Corrugated Steel Sheets | ||
| Highlight |
Custom Modular Office Building,Galvanized Steel Prefabricated Workspace,Sandwich Panel Modular Office Building |
||
Modular Office Building Custom Prefabricated Workspace For Construction And Mining Site Teams
Our Modular Office Building delivers robust, budget‑conscious and eco‑friendly workspace solutions for field‑based industrial and mining operations. Constructed with premium‑grade galvanized light‑steel profiles, these prefabricated office units are engineered to withstand harsh field‑site conditions including strong winds, seismic activity and wide temperature shifts, securing lasting structural reliability.
From compact single‑site offices to multi‑room connected administrative blocks, our Modular Office Building leverages precision CNC cutting and automated welding workflows. Every frame and component is pre‑processed and pre‑engineered within our factory workshop, drastically lowering on‑site assembly man‑hours while maintaining rigorous in‑house quality‑control protocols for remote‑project deployments.
Technical Specifications
| Project name: 20ft container with side bathroom -- 6055mm*2435mm*2895mm | ||||||
| A | Standard Configuration | Specification | ||||
| Steel Structure System | ||||||
| 1 | Roof structure | set | 1.00 | Main roof frame: 2.3mm Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | set | 1.00 | Main floor frame:2.3mm Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | pcs | 4.00 | 2.3mm Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||||
| 1 | Roof covering | set | 1.00 | 0.4mm Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | set | 1.00 | 75mm thickness Fiber glass with aluminum foil | ||
| 3 | Ceiling board | set | 1.00 | 0.35mm Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||||
| 1 | PVC flooring | set | 1.00 | 2mm thickness Vinly floor leather with glue | ||
| 2 | Floor board | set | 0.00 | 18mm fiber cement board | ||
| 3 | Floor Bottom Cover | set | 1.00 | Pu plastic tile | ||
| ContainerWall System | ||||||
| 1 | Wall panel | set | 1.00 | 50mm Rockwool sandwich panel with 0.33mm Galvanized Powder Coated color painting steel Sheet. on both sides(white color) | ||
| 2 | Door | set | 2.00 | Insulated Steel Door. (W850*H2030mm) | ||
| 3 | Window | set | 3.00 | PVC sliding window, double glass, with fly screen and security Net (W800*H1100mm) | ||
| Container Electrical System | ||||||
| 1 | Power distribution cabinet | set | 1.00 | circuit with air-break switch, leakage protector (Main power supply cable 6m2 For industrial Socket, 1.5mm2 for lighting, 2.5mm2 for common sockets, 4mm2 for AC socket. ) | ||
| 2 | Light | set | 2.00 | LED light, 24W | ||
| 3 | AC &Water heater Socket | set | 2.00 | 16A universal, with socket box | ||
| 4 | Common Socket | set | 3.00 | 10A, Universal type, with socket box | ||
| 5 | Switch | set | 2.00 | 10A , with switch box | ||
| Container Accessories | ||||||
| 1 | Side Flashing | set | 1.00 | 2 Pcs Length=5635mm, galvanized, 2pcs Length=2690mm, galvanized | ||
| 2 | Rainspout pipe | set | 1.00 | Dia. 50mm, UPVC, Length=2650mm | ||
| 3 | Pillar trim plate | set | 1.00 | Length=2520mm, 0.3mm color steel plate(with fittings & accessories) | ||
| 4 | Ceiling trim plate | set | 1.00 | Length=5640mm/2630mm, 0.3mm color steel plate(with fittings & accessories) | ||
| Plumbing system | ||||||
| 1 | washbasin | set | 1.00 | including the accessory | ||
| 2 | Closetool | set | 1.00 | including the accessory | ||
| 3 | shower | set | 1.00 | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | set | 1.00 | 6 Inch | ||
| 5 | water pipe | set | 1.00 | input and output water pipe | ||
| Additional Traingle Roof on Top of Each Block (Optional as per drawing) | ||||||
| 1 | Roof Structure | set | 1.00 | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | set | 1.00 | 0.4mm Corrugated Galvanized Powder Coated Roof Tile | ||
Why Choose Us?
- Factory‑pre‑engineered Modular Office Building workspace; major framing and interior pre‑fit work are completed off‑site, shortening administrative‑zone setup cycles for mining and construction projects
- Compact knockdown flat‑pack design, high shipping‑container loading efficiency to cut international logistics expenditure for bulk‑quantity office‑module orders
- Simple on‑site assembly workflow; complex on‑site welding or concrete pouring is not required, regular field workers can complete module erection efficiently
- Flexible expandable modular layout; Modular Office Building workspace scale can be expanded or restructured to match fluctuating on‑site management‑team headcount
- Optimized dust‑proof, sound‑insulating and weather‑resistant material performance, purpose‑built for rugged open‑air mining and construction‑site environments
- Re‑usable modular office asset; convenient disassembly without damaging primary‑frame integrity for relocation and reuse across successive field‑project locations
- Wide‑ranging custom‑configurable options: internal office partitions, storage‑cabinet layouts, exterior colour tones and site‑specific office‑oriented accessories can be adjusted to satisfy individual Modular Office Building project‑demands
Primary Applications
- Large‑scale mining project Modular Office Building on‑site management office blocks
- Highway, railway and water‑conservancy construction‑site project administration workspaces
- Remote mineral‑exploration field‑base project coordination office zones
- Mine expansion and construction‑phase temporary meeting & document‑handling facilities
- Field‑project combined complex integrating Modular Office Building and small on‑site conference rooms
- Overseas engineering project transitional site administrative workspace for engineering teams
Frequently Asked Questions (FAQ)
Q1: For our Modular Office Building deployed at dusty open‑pit mine sites, can we add extra dust‑proof upgrades for windows and ventilation openings?
A1: Yes. We supply optional heavy‑dust filter screens for windows and ventilation ports, plus enhanced perimeter sealing kits. Please note these custom selections at the quotation stage so we can incorporate them during factory fabrication.
Q2: Can we divide one single Modular Office Building flat‑pack unit into separate private office and small meeting‑room zones with factory‑installed partition panels?
A2: We can pre‑install lightweight non‑load‑bearing internal partitions in‑factory. Please provide your exact partition dimension requirements before production, as partitioning will occupy partial usable indoor floor‑space.
Q3: When stacking two‑storey Modular Office Building blocks for site‑administration use, what auxiliary accessories will you provide together with the office modules?
A3: We supply dedicated stacking connection brackets, anti‑sway fixing fittings and external‑stair technical drawings. You only need to prepare qualified lifting equipment on‑site; complete stacking‑assembly instruction documents will be delivered alongside goods.
Q4: Our remote mining‑site only runs on generator‑supplied power; does this Modular Office Building support office equipment such as printers and multi‑port docking stations?
A4: The standard circuit layout supports common office‑device loads. If you plan to deploy many high‑power office appliances, please inform us; we can upgrade internal wire gauge and distribution‑box specifications for generator‑powered working‑conditions.
Q5: What key routine‑inspection items should we carry out for long‑term‑operated Modular Office Building units on construction‑mine sites?
A5: Regularly clear mine‑dust build‑up on roof surfaces and window‑grooves; inspect door‑window sealing strips and frame anti‑corrosion coating; check distribution‑box terminals for dust accumulation; confirm stair‑and‑stack‑connection fastener tightness every quarter.