30-50% Faster Installation Construction Site Camp Flat Pack Container Accommodation with Q235B Steel and GB/T AISC Eurocode Compliance
| Design Standards: | GB/T, AISC, Eurocode, Or Local Building Codes Compliance | Material Grade: | Q235B Or Q345B Steel |
|---|---|---|---|
| Installation Speed: | 30-50% Faster Installation | ||
| Highlight |
Faster Installation Construction Site Camp,Q235B Steel Flat Pack Container,Eurocode Compliance Site Camp |
||
Construction Site Camp Flat Pack Container Accommodation For Onsite Engineering Crews
Our Construction Site Camp delivers sturdy, budget‑efficient and eco‑conscious temporary accommodation solutions for large‑scale civil‑engineering and infrastructure projects. Constructed from premium‑grade Q235B galvanized steel profiles, these prefabricated flat‑pack units are engineered to endure harsh construction‑site conditions including heavy gusts, seismic disturbance and dramatic temperature shifts, securing dependable long‑term structural performance.
From compact crew dormitory modules to multi‑unit linked Construction Site Camp residential blocks, our modular housing adopts precision CNC cutting and automated welding workflows. Every frame and fitting is pre‑punched and pre‑engineered within our factory facility, sharply cutting on‑site assembly hours and labour expenses while enforcing rigorous in‑house quality‑control protocols for overseas construction deployments.
Technical Specifications
| Project name: 20ft container with side bathroom -- 6055mm*2435mm*2895mm | ||||||
| A | Standard Configuration | Specification | ||||
| Steel Structure System | ||||||
| 1 | Roof structure | set | 1.00 | Main roof frame: 2.3mm Q235 galvanized Steel profile, with Automatic Powder Coated paint Roof purlin: C Section Steel, galvanized. Q235B steel | ||
| 2 | Floor structure | set | 1.00 | Main floor frame:2.3mm Q235 galvanized Steel profile,with Automatic Powder Coated paint Floor purlin:C Section Steel, galvanized. Q235B steel | ||
| 3 | Corner pillar | pcs | 4.00 | 2.3mm Q235 galvanized Steel profile, Galvanized with Automatic Powder Coated paint | ||
| Container roof System | ||||||
| 1 | Roof covering | set | 1.00 | 0.4mm Galvanized Powder Coated color painting steel Sheet. | ||
| 2 | Insulation | set | 1.00 | 75mm thickness Fiber glass with aluminum foil | ||
| 3 | Ceiling board | set | 1.00 | 0.35mm Galvanized Powder Coated color painting steel Sheet. | ||
| Container floor System | ||||||
| 1 | PVC flooring | set | 1.00 | 2mm thickness Vinly floor leather with glue | ||
| 2 | Floor board | set | 0.00 | 18mm fiber cement board | ||
| 3 | Floor Bottom Cover | set | 1.00 | Pu plastic tile | ||
| ContainerWall System | ||||||
| 1 | Wall panel | set | 1.00 | 50mm Rockwool sandwich panel with 0.33mm Galvanized Powder Coated color painting steel Sheet. on both sides(white color) | ||
| 2 | Door | set | 2.00 | Insulated Steel Door. (W850*H2030mm) | ||
| 3 | Window | set | 3.00 | PVC sliding window, double glass, with fly screen and security Net (W800*H1100mm) | ||
| Container Electrical System | ||||||
| 1 | Power distribution cabinet | set | 1.00 | circuit with air-break switch, leakage protector (Main power supply cable 6m2 For industrial Socket, 1.5mm2 for lighting, 2.5mm2 for common sockets, 4mm2 for AC socket. ) | ||
| 2 | Light | set | 2.00 | LED light, 24W | ||
| 3 | AC &Water heater Socket | set | 2.00 | 16A universal, with socket box | ||
| 4 | Common Socket | set | 3.00 | 10A, Universal type, with socket box | ||
| 5 | Switch | set | 2.00 | 10A , with switch box | ||
| Container Accessories | ||||||
| 1 | Side Flashing | set | 1.00 | 2 Pcs Length=5635mm, galvanized, 2pcs Length=2690mm, galvanized | ||
| 2 | Rainspout pipe | set | 1.00 | Dia. 50mm, UPVC, Length=2650mm | ||
| 3 | Pillar trim plate | set | 1.00 | Length=2520mm, 0.3mm color steel plate(with fittings & accessories) | ||
| 4 | Ceiling trim plate | set | 1.00 | Length=5640mm/2630mm, 0.3mm color steel plate(with fittings & accessories) | ||
| Plumbing system | ||||||
| 1 | washbasin | set | 1.00 | including the accessory | ||
| 2 | Closetool | set | 1.00 | including the accessory | ||
| 3 | shower | set | 1.00 | shower base, shower head, water mixture | ||
| 4 | Exhaust Fan | set | 1.00 | 6 Inch | ||
| 5 | water pipe | set | 1.00 | input and output water pipe | ||
| Additional Traingle Roof on Top of Each Block (Optional as per drawing) | ||||||
| 1 | Roof Structure | set | 1.00 | Fabricated with C section steel, Galvanized Q235 Steel. | ||
| 2 | Roof Covering | set | 1.00 | 0.4mm Corrugated Galvanized Powder Coated Roof Tile | ||
Why Choose Us?
- Factory‑prefabricated Construction Site Camp accommodation; major structural and interior pre‑fit work are completed off‑site, shortening workforce‑camp setup timelines for large construction ventures
- Compact knockdown flat‑pack layout, high shipping‑container loading efficiency to reduce international logistics spend for bulk‑volume accommodation orders
- Straightforward bolt‑together on‑site assembly; complex field welding or mass concrete pouring is not required, ordinary construction‑site labourers can complete erection efficiently
- Flexible scalable modular layout; Construction Site Camp housing capacity can be expanded or downsized dynamically to match fluctuating engineering‑crew headcount through different project phases
- Optimized dust‑proof and all‑weather material performance, purpose‑adapted for rough open‑air construction‑site operating environments
- Re‑usable modular camp asset; convenient disassembly without harming main‑frame integrity for relocation and reuse across successive construction job‑sites
- Broad custom‑configurable choices: internal sleeping‑space partitions, fixture combinations, exterior colour finishes and construction‑site‑targeted auxiliary fittings can be fine‑tuned to satisfy unique Construction Site Camp project‑specifications
Primary Applications
- Highway, railway and water‑conservation megaproject Construction Site Camp crew dormitory blocks
- Large‑scale real‑estate and industrial‑park development on‑site engineering‑crew accommodation
- Cross‑border infrastructure‑building temporary workforce residential compounds
- Post‑disaster reconstruction project short‑term on‑site crew lodging facilities
- Remote road‑network expansion field‑base Construction Site Camp housing zones
- Combined site complex integrating crew accommodation and on‑site construction‑management offices
Frequently Asked Questions (FAQ)
Q1: Our Construction Site Camp will operate in muddy, rainy tropical construction zones; do these flat‑pack containers require special base preparation?
A1: Standard compacted gravel ground works for mild conditions. For muddy tropical sites, we strongly recommend raised steel base frames or thin reinforced concrete slabs to keep frame components away from accumulated surface water. We can supply foundation reference drawings upon request.
Q2: Is it feasible to install multi‑bed shared‑room partitions inside one single Construction Site Camp flat‑pack container during factory production?
A2: Yes, non‑load‑bearing inner partitions can be pre‑installed at our workshop. Please submit your exact partition layout before production, since partitions will occupy part of the usable interior floor‑space.
Q3: When building a two‑storey Construction Site Camp dormitory block, what hardware accessories will be provided along with the flat‑pack modules?
A3: We supply dedicated stacking connection brackets, anti‑toppling fasteners and external‑stair assembly manuals. You will only need local lifting equipment on‑site; full step‑by‑step installation documentation will be delivered together with goods.
Q4: Our remote construction‑site only relies on generator‑supplied power; what should we note for the electrical system of this Construction Site Camp unit?
A4: The pre‑installed wiring fits generator power. If generators produce frequent voltage swings, we advise adding external voltage stabilizers. We can also upgrade wire gauge and distribution‑box specs if you anticipate heavy simultaneous electrical loads.
Q5: For long‑term‑deployed Construction Site Camp flat‑pack containers at dusty construction yards, what key maintenance checks should our on‑site team perform quarterly?
A5: Clear construction dust and debris from roof gutters and window grooves; inspect door‑window rubber sealing strips for ageing; examine frame paint and galvanized layers for scratch‑induced corrosion; retighten stacking and module‑joining bolt connections every three months.