Robust modular office building serves as practical workspace for remote project sites
| Steel Frame Material: | Q235 Galvanized Square Tube | Wall Panel Thickness: | 50/75/100mm Rockwool |
|---|---|---|---|
| Window Type: | PVC Double-glazed With Screen | Roof Panel Thickness: | 50/75/100mm Rockwool |
| Electrical Sockets: | 10A/16A With Junction Box | Door Dimensions: | 850mm X 2030mm |
| Highlight |
modular office building for remote sites,robust modular office workspace,practical modular office building |
||
Robust modular office building serves as practical workspace for remote project sites
This robust modular office building acts as dependable practical workspace for remote project sites. Manufactured with heavy‑duty hot‑dip galvanized steel frame and automated powder‑coating anti‑corrosion finish, paired with 75 mm fire‑rated fiberglass insulated sandwich panels, this flat‑pack modular office finishes most interior processing inside YAGO’s automated workshop to cut complicated field‑site modification work. Pre‑integrated international‑standard electrical circuits, double‑glazed noise‑reducing windows and wear‑resistant anti‑static flooring create a proper working environment for document processing, team briefings and on‑site project coordination. Individual office modules can be connected side‑by‑side or stacked two‑high to expand into multi‑room office complexes. Thanks to robust structural performance and all‑weather sealing treatment, this modular office building stands up to dust, salt‑mist and extreme temperature shifts, serving as steady practical workspace for varied remote project sites.
Technical Specifications
| Project name: Senior and Junior Management building | |
| Item | Specification |
| Main Steel Frame | |
| Steel frame | Square Tube Columns, Q235 Steel, Galvanized Steel with Powder coated painting |
| Steel structure roof | C Section Steel, Q235 Steel, galvanized |
| Roof Purlin | C Section Steel, Q235 Steel, galvanized |
| Wall purlin | C Section Steel, Q235 Steel, galvanized |
| Cross bracing | L40*3 |
| Anchor bolts | M16, chemical Bolts |
| Ordinary bolt | 4.8S,Zincification, |
| Roofing and wall System | |
| Roof Panel | 50mm/75mm/100mm Rockwool Sandwich panel |
| Wall Panel | 50mm/75mm/100mm Rockwool Sandwich panel |
| Ceiling & Flooring | |
| Dry room Ceiling | Gypsum board,with frame |
| Dry room Floor leather | Vinyl floor leather |
| Wet room Ceiling02 | Calcium silicate board Ceiling with Ceiling keel |
| Wet Ceramic tile | Ceramic Tiles |
| Doors&windows | |
| Door | Insulated Steel door, 850mm*2030mm |
| Window | PVC sliding window with double glas, with screen and window blind |
| Electric unit and sanitary facilities&plumbing | |
| Electric cable | With electrical cable for lighting, socket, AC and water heater system. |
| Lights | LED light 220V,60HZ |
| Switch | with junction box |
| Socket | 10A and 16A , with junction box |
| Power distribution cabinet | box+switch+earth leakage protective device |
| Toilet | including water valve |
| Washbasin | including faucet, water pipe |
| Shower | With shower head, water mixture, and shower base |
| Water pipe | input and output water pipe |
Why Choose Us?
- Heavy‑duty frame fabrication optimized for harsh remote‑site office operation.
- Strict factory quality inspection for consistent modular office unit performance.
- Flexible interior partitioning to match remote‑site office workflow requirements.
- Clear assembly documentation to guide field‑team setup in isolated locations.
Primary Applications
-
Remote‑site project management office: Robust modular workspace for field engineering supervisors in isolated zones.
-
Off‑grid exploration field command hub: Expandable prefab office for resource‑exploration project coordination tasks.
-
Overseas cross‑border field project office compound: Multi‑unit modular workspace for international remote construction assignments.
Frequently Asked Questions (FAQ)
Q: Can this robust modular office building sustain daily office work under dusty desert or coastal salt‑mist conditions?
A: Yes, anti‑corrosion frame plus sealed panel joints mitigate dust and salt‑mist erosion for stable remote‑site office performance.
Q: Can we fit specialized office hardware such as large‑format plotters and server gear inside this modular office unit?
A: We can upgrade internal circuit load upon request to support heavy‑duty office equipment for remote‑site workflows.
Q: What ground preparation work is essential to place this modular office building at an undeveloped remote site?
A: Level compacted gravel ground meets basic requirements; full concrete slab foundation is not mandatory for standard deployment.